Monday, May 30, 2005

Prepping Right Wing - 3.5 Hours (82.5 Total)

Today I prepped the right wing for skinning. This included: installing select fuel lines, drilling holes in the root rib, installing the flap teleflex cable, and taping over the bolt heads. I also taped the tension cable. I also assembled the ribs. I started skinning the wing and got as far as I could without help.