Cowling - 1 hour (395 Total)
Last week I revisited the welder and had him add a few spot welds to secure the cooler to the cowl. This should hold the cooler in place without requiring me to use rivets or bolts.
I then needed to modify the aluminum angle that I fabricated to cover the rear holes so they would fit around the new weld beads. I then riveted the aluminum angles into place.